| |
|
| |
|
|
Structure :
|
R.C.C 1:2:4
|
|
Super Structre :
|
Brick work in cement
mortar. |
|
Doors :
|
Main door teak wood
with polishing and other door frames
in medim teak wood with flush type shutters. |
|
Windows :
|
Teak framed fully glazed
shutters with pin headed glass and safety grills. |
|
Plastering :
|
External and internal
plastering cement mortar in two coats with sponge finish
and hall with luppam finish and POP border. |
|
Flooring :
|
Ceramic tiles / Marble
stones |
|
Kitchen :
|
Granite stone platform
with sink. |
|
Toilets :
|
Ceramic dadoing up
to 5' Height. |
| Sanitary Fittings : |
Standard C.P fitting
with one indian and on western commode in white colour. |
|
Electrical Fittings :
|
Standard electrical
fittngs with adequate number of points. |
|
Common Area :
|
Flooring in common
areas and for staircase is marble.Provision for generator,electrical
panel room,bore-well,sump,overhead tank & watchman
room with common toilet. |
|
Parking :
|
Paved parking area. |
|
Lifts :
|
3 lifts of 6 Passenger
capacity (Genrator backup for one lift). |
|
Colouring :
|
Oil bound distemper
for interiors.Cement based paint for exteriors. |