| |
|
| |
|
|
Structure
:
|
R.C.C 1:2:4
|
|
Super Structre :
|
Brick work in cement
mortar. |
|
Doors :
|
Main door teak wood
with polishing and other door frames
in teak with flush type shutters. |
|
Windows :
|
Teak framed shutters
with pin headed glass and safety grills. |
|
Plastering :
|
External and internal
plastering cement mortar in two coats with sponge finish. |
|
Flooring :
|
Marble Flooring. |
|
Kitchen :
|
Granite stone platform
with steel sink. |
|
Toilets :
|
Ceramic dadoing up
to door level. |
|
Sanitary Fittings :
|
Standard C.P and ceramic
fittings. |
|
Electrical Fittings :
|
Standard electrical
fittngs with adeqate number of points. |
|
Common Area :
|
Flooring in common
areas and for staircase is marble.Provision for generator,electrical
panel room,bore-well,sump,overhead tank & watchman
room with common toilet. |
|
Parking :
|
Paved parking area. |
|
Lifts :
|
4 lifts
provided. |
|
Colouring :
|
Plastic emulsion paints
for interiors with smooth Altek finish.Cement based paint
for exteriors. |